11/11/2025 11:00:09 AM by Kylie Cook
Clubhouse Overview, Poolhouse Aerial Overview, Patio, Lobby Framing, Poolhouse Veneer & Siding, and Site Concrete
11/4/2025 3:26:57 PM by Shannon Showers
Clubhouse Overview, Clubhouse Veneer, Poolhouse Overview, Patio, Lobby Framing, Pool Deck Prep, Poolhouse Siding & Veneer, Poolhouse Trellis and Site Concrete.
10/28/2025 9:24:07 AM by Kylie Cook & Mallory Syx
Patio, Patio Frames, Clubhouse Sheathing, Cart Path, Lobby Steel, Clubhouse Framing, Clubhouse 1st Floor Framing, Clubhouse 1st Floor Framing/Rough Ins, Fireplace Framing, and Poolhouse
10/21/2025 10:41:05 AM by Kylie Cook & Mallory Syx
Aerial Overview Clubhouse, Aerial Overview Poolhouse, Canopy T&G, West Curtain Wall, Cart Path, Underdrains, Trench Heaters, 1st Floor Slab, Above Ceiling Operations, Curtain Wall, and Interior Framing
10/14/2025 10:45:30 AM by Kylie Cook and Mallory Syx
Roofing, Service Drive, Lobby, Clubhouse MEP, Curb Prep, Pool Deck, Cart Barn, Cart Path Prep, and Cart Path Pour